2010 Industrial building extension, ZIU
Industrial building extension
Careful design led to the construction of a new extension that integrates harmoniously both within the industrial setting and the surrounding natural context. The colour palette reflects the company’s logo: structural elements in a bright blue tone and white aluminium cladding create a lively contrast, giving the building a distinctive and contemporary identity. The intervention also included the refurbishment of part of the original structure in order to obtain the Fire Prevention Certificate.
Location: Udine
Date: 2010
Client: private
Assignment: safety coordination, construction supervision
Works cost: € 188,562.91 + VAT



